GreenPipe Global Pipeline Solutions

Careers | Site Map | Contact Us

Compliance with EUB Directive 041
GreenPipe Industries Ltd.

On July 20, 2006, the Alberta Energy and Utilities Board (EUB) approved Directive 041. This directive states that all pipeline licensees “must develop and implement an integrity management program in accordance with CSA Z662-03, Annex N”.

Licensees must develop their integrity management programs by January 1, 2007.

What is Annex N?

According to Directive 041, CSA Z662-03, Annex N is a set of guidelines for ensuring that pipelines are “capable of transporting product safely, without short-term or long-term negative effects on public safety or the environment”.

How can GreenPipe help?

Our pipeline integrity software, PipeCraft™, provides owners and operators with the tools to successfully design, operate, and maintain their pipelines. As part of a complete integrity management program, PipeCraft can help you observe the following Annex N guidelines:

  • Documentation and information methods - PipeCraft includes methods for collecting, integrating, and analyzing the required information.
  • Pipeline integrity management program records - PipeCraft helps you prepare and manage records related to pipeline design, construction, operation, and maintenance.
  • Change management - PipeCraft enables you to track changes that affect the integrity, or your ability to manage the integrity, of your pipelines.

Call GreenPipe now

To find out how PipeCraft can be a part of your solution, contact us.